Skip to content
Site map
Help
Speech enable
Text Size
Accessibility
Maidstone Borough Council
Search
Home
News
A-Z
FAQs
Do It Online
Contact Us
You either have
JavaScript
disabled or your
web browser
does not support it.
Some functionality on this site may not work as intended.
Advice and benefits
Business
Community and living
Council and democracy
Environment and planning
Abandoned vehicles
Building control
Conservation
Deaths, funerals and cremations
Emergencies
Environment
Grants
Licenses and street trading
Parking
Parks and open spaces-
Planning
Heritage, landscape and design
Kent International Gateway
FAQs
KIG Application
Contact the Planning Teams
Local Land Charges
Development control
Development control - enforcement
Listed buildings register
Local development framework
Planning - high hedges
Private housing
Recycling, rubbish and waste
Street care and cleaning
Town centre management
Housing
Jobs and careers
Leisure and culture
Transport and streets
Home
>
Environment and planning
>
Planning
>
Kent International Gateway
>
KIG Application
Digital Maidstone
Find it:
Bin collection day
Waste and recycling
Interactive maps
Parks
Planning applications
Report it:
Abandoned vehicles
Flytipping
Grafitti
Dog issues
Litter
Missed bin collections
Noise problems
Pest issues
Dead animals
Public toilet issues
Dog fouling
Apply for it:
Planning permission
Hire recreation grounds
Bulky waste collection
Order or remove a bin
Contact Us
Planning
Send Email
01622 602000
Browser does not support script.
Browser does not support script.
Browser does not support script.
Browser does not support script.
Browser does not support script.
Kent International Gateway Application.
Background Committee Report Documents
draft South East Plan Companion Document LOW RES.pdf
KIG Alternative Sites (Planning issues).PDF
KIG Alternative Sites App A (new pdf).pdf
KIG Alternative Sites Appendices C and D 300409.pdf
KIG Alternative Sites Appendix B 300409.pdf
KIG Alternative Sites Main Text 300409.pdf
KIG Ecology Report.pdf
KIG Economic Assessment.PDF
KIG Landscape Figure 1-7.pdf
KIG Landscape main report.pdf
KIG Landscape photographs.pdf
KIG Lighting Report.pdf
KIG Logistics 300409.pdf
KIG Noise Appendix.pdf
KIG Noise main report.pdf
Lighting_Report.pdf
SRA policy SRFI 2004.pdf
Design and Access statement
01_TECHNICAL REPORT.pdf
02_Corridor Luminance.pdf
03_LIZ0067878-A_C.pdf
04_LIZ0067878-B_C.pdf
05_LIZ0067878-C_C.pdf
06_LIZ0067878-Sch_C.pdf
07_KIG-ALL.Rev18.06.07-073D.a-d.pdf
08_96250146 ORACLE 1W 150W HST DGE CL1 EFL.pdf
09_96231244 ORUS 35W HIT DGE CL1 MFX ROAD.pdf
10_96220582 ORACLE 2C 250W HID 240V CL1 EFL.pdf
11_96012471 CHAMPION 1K HST E40 WI15M.pdf
12_96008452 TROIKA 600W HST E40 60-70D.pdf
13_96007508 TROIKA 250-400W HIT E40 60-70D.pdf
Design & Access Statement.doc
Environmental Statement
Chapters
1 - Introduction
Appendices
Appendix 1.1 - MBC Letter.pdf
Appendix 1.1 - Summary of Responses.pdf
Introduction.doc
10 - Drainage and Flood Risk
FRA Assessment
2007-08-06 rjf flood risk assessment final Rev B 2005-180A.pdf
Appendix A - Site Location Plan.pdf
Appendix B - Indicative 100 Year Floodplain Map.pdf
Appendix C - Source Protection Zone Map Extract.pdf
Appendix D - Groundwater Abstraction Location Plan.pdf
Appendix E - Proposed Development Accomodation Schedule.pdf
Appendix F - Greenfield Run-off Calculations 1.pdf
Appendix F - Greenfield Run-off Calculations 2.pdf
Appendix F - Greenfield Run-off Calculations 3.pdf
Appendix G - 2007-06-19 Detention Pond Preliminary Design Calculations.pdf
Appendix G part 1.pdf
Appendix G part 10.pdf
Appendix G part 11.pdf
Appendix G part 12.pdf
Appendix G part 13.pdf
Appendix G part 2.pdf
Appendix G part 3.pdf
Appendix G part 4.pdf
Appendix G part 5.pdf
Appendix G part 6.pdf
Appendix G part 7.pdf
Appendix G part 8.pdf
Appendix G part 9.pdf
Appendix H - Preliminary Permeability Test Results.pdf
Appendix I - Southern Water Sewer Records 1.pdf
Appendix I - Southern Water Sewer Records 2.pdf
Appendix I - Southern Water Sewer Records 3.pdf
Appendix J - 2005-180A-C7_15-01 Site Layout Plan Rev C.pdf
Appendix J - 2005-180A-C7_15-02 Existing Greenfield Catchment Areas Rev C.pdf
Appendix J - 2005-180A-C7_15-03 Rev E.pdf
Appendix J - 2005-180A-C7_15-04 Rev E.pdf
Appendix J - 2005-180A-C7_15-FW02 Rev E.pdf
Appendix J - 2005-180A-C7_15-SW-04 Rev B.pdf
Appendix J - 2005-180A-C7_15-SW-05 Rev B.pdf
Appendix J - 2005-180A-C7_15-SW-06 Rev B.pdf
Appendix J - 2005-180A-C7_15-SW01 Rev E.pdf
Appendix J - 2005-180A-C7_15-SW02 Rev E.pdf
Appendix J - 2005-180A-C7_15-SW03 Rev E.pdf
Appendix J- 2005-180A-C7_15-FW01 Rev E.pdf
HIA
1. 2007-08-06 rjf hydrogeological impact assessment final Rev A 2005-180A.pdf
2. Appendix A - Site Location Plan.pdf
3. Appendix B - British Geological Survey Map Extract.pdf
4. Appendix C - Source Protection Zone Map Extract.pdf
5. Appendix D - Groundwater Abstraction Location Plan.pdf
6. Appendix E - 2005-180A-C7_15-01 Site Layout Plan Rev C.pdf
7. Appendix E - 2005-180A-C7_15-03 Rev E.pdf
8. Appendix E - 2005-180A-C7_15-04 Rev E.pdf
ES Drainage and Flood Risk.doc
11 - Noise and Vibration
Appendices
JAE4140.App11.1.doc
JAE4140.App11.10.pdf
JAE4140.App11.11.pdf
JAE4140.App11.12.pdf
JAE4140.App11.13.pdf
JAE4140.App11.14.pdf
JAE4140.App11.2.doc
JAE4140.App11.3.doc
JAE4140.App11.4.doc
JAE4140.App11.5.doc
JAE4140.App11.6-A 230707.doc
JAE4140.App11.6.pdf
JAE4140.App11.7.doc
JAE4140.App11.8.doc
JAE4140.App11.9.pdf
Figures
JAE4140.Fig11.1.pdf
JAE4140.Fig11.2.pdf
JAE4140.Fig11.3.pdf
Noise and vibration.doc
12 - Air Quality and Dust
Appendices
Air Quality ES Chapter appendices _Aug07_.pdf
Air Quality.doc
13 - Cultural Heritage
Appendices
Appendix -13-1.doc
Appendix -13-2.doc
Appendix -13-3.doc
Appendix -13-4.doc
Appendix -13-5.doc
Appendix -13-6.doc
Appendix -13-7 - Buildings Assessment Final.doc
Appendix -13-8 Watching Brief Report.pdf
Figures
EIA Fig 1 Sites and Monuments.pdf
EIA Fig 2 Listed Buildings and Conservation(25000).pdf
EIA Fig 3 Archaeological Information within 2-5km.pdf
Cultural Heritage -JEM checked.doc
14 - Socio-economic Aspects
Socio Economics.doc
15 - Energy
Energy.doc
2 - Site and Proposals
Appendices
Development Specification
Construction Method Statement
Construction Programme
KIG Diagram.PDF
KIGDRA~1.PDF
KIGDRA~2.PDF
NBSGSP~1.DOC
Cross Sections
A17074_3201_C_210_P2.pdf
A17074_3201_C_211_P2.pdf
A17074_3201_C_212_P2.pdf
A17074_3201_C_213_P2.pdf
A17074_3201_C_214_P2.pdf
A17074_3201_C_220_P2.pdf
A17074_3201_C_221_P2.pdf
A17074_3201_C_222_P2.pdf
A17074_3201_C_223_P2.pdf
A17074_3201_C_224_P2.pdf
KIG Construction Method Statement.doc
Masterplan
masterplan.pdf
Parameter Plans
001 Application site & Contours_Parameters plan 1.pdf
002 Woodland and tree_Parameter Plan 2.pdf
003 Highways rights of way & diversions_Parameter plan 3.pdf
004WAT~1.PDF
005 Services & ancillary service buildings_Parameter Plan 5.pdf
006 Landscape armature.pdf
007 Rail and intermodal area plan.pdf
008 A20 access internal roads & bridges.pdf
009 Development zones & floorspace by use.pdf
010A Building zones retaining walls.pdf
011_Detail Section 1,2,3.pdf
012 Detail Section 4 , 5.pdf
013 Detail Section 6 , 7 ,8.pdf
014 Detail Section 9 , 10 , 11.pdf
015 Detail Section 12 , 13 , 14.pdf
016 Detail Section 15.pdf
017 Detail Section 15.pdf
018 Detail Section 16.pdf
019 Detail Section 17-18.pdf
020 Detail Section 19.pdf
Development Specification Environmental Statement.doc
Location Plan.pdf
Masterplan.pdf
Site and Proposals.doc
Wider Location Plan.pdf
3 - Planning Context
Planning Context.doc
4 - Site Selection
Site Selection.doc
5 - Traffic and Transportation
Figures
2007-06-19 Figure 5.1 GCB study area 2005-180A.ppt
2007-06-19 Figure 5.2 GCB Potential pedestrian and cycle improvements 2005-180A.ppt
2007-08-14 JT Figure 5.3 Opportunities for Bus Improvements.pdf
Traffic and Transportation.doc
6 - Landscape and Visual Impacts
Appendices
Appendix 6.A Landscape and Visual Impact Assessment Methodology and Glossary.doc
Appendix 6.B CEMP and LMP - Contents.doc
Appendix 6.C Outline Landscape Specification.doc
Appendix 6.D Visual Effects Table Rev B Tracked Changes.doc
Appendix 6.E slope reinforcement.pdf
Figures
6.1 Topography PlanRevA.pdf
6.15 Landscape Framework.pdf
6.2 Landscape Character Assessmen...pdf
6.3 Maidstone Borough Landscape C...pdf
6.4 Landscape Appraisal Plan.pdf
6.5 VIA plan Rev A 090707.pdf
6.6 Aerial Photosheet.pdf
6.8 Photo viewpoints revA.pdf
Landscape and Visual Effects.doc
List of Figures and Appendices.doc
7 - Lighting
Appendices
Appendix 7.1 ILE 2005 guidance.pdf
Appendix 7.2a Technical Report.pdf
Appendix 7.2b Intermodal - Additional low level lighting spec.pdf
Appendix 7.2b Intermodal Corridor Illuminance.pdf
Appendix 7.2b Intermodal Corridor Luminance.pdf
Appendix 7.2c Illustrative photograph 1.pdf
Appendix 7.2c Illustrative photograph 2.pdf
Appendix 7.2c Illustrative photograph 3.pdf
Appendix 7.2c Illustrative photograph 4.pdf
Appendix 7.3 Consultation.pdf
Figures
Fig 7.1 Night-time Viewpoints and Monitoring.pdf
Fig 7.2 Night-time Viewpoints Sheet 1.pdf
Fig 7.3 Night-time Viewpoints Sheet 2.pdf
KIG ES Lighting.doc
8 - Ecology
Appendices
Appendix 8A
Figures
2007 Fig 1 Site Location Plan.pdf
2007 Fig 10 Bat Activity Survey East side 2006.pdf
2007 Fig 11 Bat activity Aug 2006.pdf
2007 Fig 12 Bat activity Aug 2006.pdf
2007 Fig 2 Bat emergence West side 2005.pdf
2007 Fig 3 Bat emergence West side 2006.pdf
2007 Fig 4 Bat emergence East side 2005.pdf
2007 Fig 5 Bat emergence East side 2006.pdf
2007 Fig 6 Tree survey West side 2005 and 2006.pdf
2007 Fig 7 tree survey results east.pdf
2007 Fig 8 Bat Activity Survey 2005.pdf
2007 Fig 9 Bat Activity Survey West Side 2006.pdf
Phase I Habitat Survey
Appendix B of Phase 1 report part 1.pdf
Appendix B of Phase 1 report part 2.pdf
Ecology Phase 1 updated report Dec06.pdf
Dormouse report 2006.pdf
GCN report December 2006.pdf
Hollingbourne Bat Report 07Feb07.pdf
KIG ES Appx 8A (conts sheet).doc
KIG Invertebrate Appraisal Apr07.pdf
Reptile Report Nov2005.pdf
Appendix 8B
2007 Records Centre Data.pdf
AB-EA _TC_ record of conversation 12Apr07.pdf
EA email 17_4_07.pdf
KCC Ecology Meeting 06Feb07 - Meeting Notes.pdf
Meeting Notes KWT-WSP issued 26Mar07 .pdf
Meeting Notes NE-WSP issued 26Mar07 .pdf
Appendix 8C
Appendix 8C.doc
Appendix 8D
Appendix 8D.doc
Appendix 8E
Appendix 8E.doc
Appendix 8F
Appendix 8F.doc
Appendix 8G
Designing Homes for Forest Bats.pdf
Figures
Fig 1 Prelim Zone of Influence Jun07.pdf
Fig 2 Phase 1 Habitat Survey May07 ES.pdf
Fig 3 Key Ecological Mitigation May07 ES.pdf
ES Ecology and Nature Conservation.doc
9 - Ground Conditions
Appendices
Appendix 1 - KIG- Geotechnical and Ground Contamination.doc
Appendix 2 - Ground Investigation Report.pdf
Figures
E011814-576_FIG9.1.pdf
E011814-576_FIG9.2.pdf
E011814-576_FIG9.3.pdf
E011814-576_FIG9.4.pdf
Ground Conditions.doc
CONTENTS.doc
KIG Environmental Statement Cover.pdf
KIG JAN 2009
ES Reg 19 furth info rev A Nov 2008
05 Further Landscape and Visual Information
09 Bef and After Cross Sections
A17074_3201_C_241_P2.pdf
A17074_3201_C_242_P2.pdf
A17074_3201_C_243_P2.pdf
A17074_3201_C_244_P2.pdf
A17074_3201_C_245_P2.pdf
10 Bef and After Ground Modeling Plans
A17074_3201_C_231_P4.pdf
A17074_3201_C_232_P3.pdf
A17074_3201_C_233_P5.pdf
A17074_3201_C_234_P3.pdf
01 Supporting Landscape and Visual Information Rev C.pdf
02 Theoretical Zone of Visual Influence.pdf
03 Kent International Gateway Lighting.pdf
04 3073-1 Long Cross Section.pdf
05 3073-2 Long Cross Section.pdf
06 3073-3 Long Cross Section.pdf
07 3073-P-08 Rev A Veg Retained_Rem.pdf
08 3073-P-09 Rev A Veg Retained_Rem.pdf
06-08 Further Ecological Information
01 Further Ecological Information.pdf
02 Breeding Bird Report 2007_4Sept07.pdf
03 GCN report September 2007.pdf
00 - Ltrs 031008and211108+Index to MBC.pdf
01- Amended Parameter Plans.pdf
02 - 300908 rail supplem report.pdf
03 - Tree Survey.pdf
04- 040608 Agr land classif rep.pdf
09 - HDS129KIG Supplementary Socio-Economic Information 0310.pdf
10 - HIA.pdf
11 - 160608 other sites supplem rep.pdf
13 - Outline Security Strategy .pdf
14 - Socio-Economic Clarifications .pdf
15 - KIG Additional Bat Surveys 28Oct08.pdf
16 - KIG Habitat Balance Sheet 28Oct08.pdf
17 - KIG water vole survey 28Oct08.pdf
Trans Supp Info 5 Jan 2009
090105 - Final TA Report
Transport Supplementry Information Appendices
Appendix A.pdf
Appendix B.pdf
Appendix C.pdf
Appendix D.pdf
Appendix E Part 1.pdf
Appendix E Part 2.pdf
Appendix E Part 3.pdf
Appendix F.pdf
Appendix G.pdf
Appendix H.pdf
Appendix I.pdf
Appendix J.pdf
Appendix K.pdf
Appendix L.pdf
Appendix M.pdf
Appendix N.pdf
Appendix O.pdf
Appendix P.pdf
Appendix Q.pdf
Appendix R.pdf
Appendix S.pdf
2008-12-24 Transport Supplementary v0.4 Final Compressed ISS.PDF
Figures 1-10.pdf
KIG Invertebrate Report-for issue.pdf
Photomontage & Viewpoints 1,1a,2 Rev A.pdf
Photomontage & Viewpoints 3,4,5 Rev A.pdf
Photomontage & Viewpoints 6,7,8 Rev A.pdf
planning Issues Report
Appendices
Key Diagram.pdf
Location Plan.pdf
Planning Policy Notations.pdf
Site and surrounding.pdf
Wider Location Plan.pdf
Report Text
Planning Issues Report.doc
Pre-Inquiry Meeting – 12th June 2009
PIM Notes 12-06-09.doc
Supplemental Environmental Information - August 2009
appendix 1.pdf
appendix 2.pdf
appendix 4.pdf
appendix 5.pdf
appenidix 3.pdf
Non Technical Summary 1.pdf
Supplemental Environmental Information - July 2009
Supplemental Environmental Statement
01 Introduction
090629 - Introduction.pdf
02 Site
10B_Building Zones.pdf
1_Application Site.pdf
2._Site_and_Proposals__formatted__260609 + JCW alts to date,.pdf
2B_Woodland and Trees.pdf
3B_Highways_Rights of Way.pdf
4B_Watercourses Diversions - ponds.pdf
5A_Services.pdf
6B_Landscape Armature.pdf
7A_Rail - Intermodal.pdf
8A_Access Road - Bridges.pdf
9A_Development Zones.pdf
Development_Specification_ES_260609 + JCW alts.pdf
Masterplan_FE-107 N_A0 copy.pdf
03 Planning Context
090624 - Planning Context.pdf
04 Site Selection
090615 - Site Selection.pdf
05 Transport
090701 - SES Chapter 5 (July dated).pdf
30-06-09 SUPP TRANSPORT STATEMENT SES.pdf
06 Landscape
3073-P-08 Rev B FINAL.pdf
3073-P-09 Rev B FINAL.pdf
3073-P-10 Rev B FINAL.pdf
Appendix 6.D Rev A Visual Effects Table FINAL.pdf
Appendix SES 6.A Schedule of Documents and Information B FINAL.pdf
Appendix SES 6.B Woodland and Tree Conservation or Removal Schedule FINAL.pdf
Figure 6.15 Rev A 3073-P-01Rev F FINAL.pdf
Figure 6.5 Rev A FINAL.pdf
Figure SES 6.1 FINAL.pdf
Figure SES 6.2 FINAL.pdf
Figure SES 6.3 3073-P-12 C FINAL.pdf
Figure SES 6.4 3073-P-11 A FINAL.pdf
Figure_SES_6.5_PhotomontageViewpoint9_HIGH_RES_FINAL.png
Landscape and Visual SES Unformatted Draft 4 FINAL.pdf
PhotomontageViewpoint1a_RevA_HIGH_RES_FINAL.png
PhotomontageViewpoint1_RevA_HIGH_RES_FINAL.png
PhotomontageViewpoint3_RevA_HIGH_RES_FINAL.png
PhotomontageViewpoint4_RevA_HIGH_RES_FINAL.png
PhotomontageViewpoint5_RevA_HIGH_RES_FINAL.png
07 Lighting
Appendix 7.2.pdf
Fig 7.1.1.pdf
Fig 7.4.pdf
Kent International Gateway 30-06-09 A - THORN LIGHTING LTD A.pdf
Kent International Gateway 30-06-09 B - THORN LIGHTING LTD A.pdf
Kent International Gateway 30-06-09 C - THORN LIGHTING LTD A.pdf
Kent International Gateway 30-06-09 SCHEDULE - THORN LIGHTIN.pdf
KIG SES Lighting.pdf
08 Ecology
3073-P-22 Figure 8.4.pdf
Ecology Appendices issued 30thJune.pdf
Ecology Revised ES Chapter 30thJune issue.pdf
Figure 8.1 - Ecological Constraints & Zone of Influence.pdf
Figure 8.2 - Phase 1 Habitat Survey.pdf
Figure 8.3 - Habitat Connectivity Plan.pdf
09 Ground Conditions
1000.pdf
1005.pdf
1006.pdf
1007.pdf
1008.pdf
1009.pdf
Chapter 9 - Ground Conditions.pdf
10 Drainage and Flood Risk
Appendix 10.1
2009-07-01 R00001 rjf KIG FRA Addendum final 9T4125_.pdf
Appendix A - Illustrative Masterplan107 N.pdf
APPENDIX A.pdf
Appendix B - Proposed Development Accommodation Schedule.pdf
APPENDIX B.pdf
Appendix C - 9T4125 - KIG Total Site Run off.pdf
Appendix C - KIG Proposed Impermeable Area Summary.pdf
APPENDIX C.pdf
Appendix D - Attenuation Calculations Catchment 1A Pond 100y.pdf
Appendix D - Attenuation Calculations Catchment 1B Pond 100y.pdf
Appendix D - Attenuation Calculations Catchment 2A Stormcell.pdf
Appendix D - Attenuation Calculations Catchment 2B Stormcell.pdf
Appendix D - Attenuation Calculations Catchment 2C pond 100y.pdf
Appendix D - Attenuation Calculations Catchment 2D pond 100y.pdf
Appendix D - Attenuation Calculations Catchment 3A Pond 100y.pdf
Appendix D - Attenuation Calculations Catchment 3B Pond 100y.pdf
Appendix D - Attenuation Calculations Catchment 3C Stormcell.pdf
Appendix D - Attenuation Calculations Catchment 3D Stormcell.pdf
APPENDIX D.pdf
Appendix E - Highways Agency Drainage Record Drawings W1.pdf
Appendix E - Highways Agency Drainage Record Drawings W2.pdf
Appendix E - Highways Agency Drainage Record Drawings W3.pdf
APPENDIX E.pdf
Appendix F - Dwg No 9T4125-FRA-01.pdf
Appendix F - Dwg No 9T4125-FRA-02.pdf
Appendix F - Dwg No 9T4125-FRA-03.pdf
Appendix F - Dwg No 9T4125-FRA-04.pdf
Appendix F - Dwg No 9T4125-FRA-05.pdf
Appendix F - Dwg No 9T4125-FRA-06.pdf
Appendix F - Dwg No 9T4125-FRA-07.pdf
Appendix F - Dwg No 9T4125-FRA-08.pdf
Appendix F - Dwg No 9T4125-FRA-09.pdf
Appendix F - Dwg No 9T4125-FRA-10.pdf
Appendix F - Dwg No 9T4125-FRA-11.pdf
Appendix F - Dwg No 9T4125-FRA-12.pdf
Appendix F - Dwg No 9T4125-FRA-13.pdf
Appendix F - Dwg No 9T4125-FRA-14.pdf
Appendix F - Dwg No 9T4125-FRA-15.pdf
Appendix F - Dwg No 9T4125-FRA-16.pdf
Appendix F - Dwg No 9T4125-FRA-17.pdf
APPENDIX F.pdf
Appendix 10.2
2009-07-02 R00002 rjf KIG HIA Addendum final 9T4125.pdf
Appendix A - Illustrative Masterplan107 N.pdf
Appendix B - Proposed Development Accommodation Schedule.pdf
Appendix F - Dwg No 9T4125-FRA-01.pdf
Appendix F - Dwg No 9T4125-FRA-02.pdf
Appendix F - Dwg No 9T4125-FRA-03.pdf
Appendix F - Dwg No 9T4125-FRA-04.pdf
Appendix F - Dwg No 9T4125-FRA-05.pdf
Appendix F - Dwg No 9T4125-FRA-06.pdf
Appendix F - Dwg No 9T4125-FRA-07.pdf
Appendix F - Dwg No 9T4125-FRA-08.pdf
Appendix F - Dwg No 9T4125-FRA-09.pdf
Appendix F - Dwg No 9T4125-FRA-10.pdf
Appendix F - Dwg No 9T4125-FRA-11.pdf
Appendix F - Dwg No 9T4125-FRA-12.pdf
Appendix F - Dwg No 9T4125-FRA-13.pdf
Appendix F - Dwg No 9T4125-FRA-14.pdf
Appendix F - Dwg No 9T4125-FRA-15.pdf
Appendix F - Dwg No 9T4125-FRA-16.pdf
Appendix F - Dwg No 9T4125-FRA-17.pdf
Appendix 10.3
20090702 KIG.PDF
Appendix A.PDF
Appendix B - W1 5.1.pdf
Appendix B - W1 5.2.pdf
Appendix B - W1 a.pdf
Appendix B - W2 6.1.pdf
Appendix B - W2 6.2.pdf
Appendix B - W2 a.pdf
Appendix B - W3 7.1.pdf
Appendix B - W3 7.2.pdf
Appendix B - W3 a.pdf
2009-06-30 rjf drainage and flood risk SES chapter 10 final .pdf
11 Acoustics
kig supplementary es final.pdf
ses appendix.pdf
12 Air Quality and Dust
Air Quality SES Chapter Appendices _June09_.pdf
Chapter 12 Air Quality Supplemental ES Final v1.pdf
13 Heritage
HB input to Supp ES 24.06.09 2nd draft + JCW alterations.pdf
14 Sociological
KIG Supplementary ES Socio Economic Chapter Final Version 30.pdf
15 Energy
090630 - Energy.pdf
Cover_Letter.PDF
Design and Access Statement.pdf
Supplemental Non Technical Summary.pdf
TPO Maps
TPO 13.PDF
TPO 14.PDF
TPO 15.PDF
TPO 16.PDF
TPO 17.PDF
TPO 18.PDF
Traffic Assessment plus figs and appends
Appendices
APPENDIX A_001.pdf
APPENDIX B_001.pdf
APPENDIX C_001.pdf
APPENDIX D_001.pdf
APPENDIX E_001.pdf
APPENDIX F_001.pdf
APPENDIX G_001.pdf
APPENDIX H_001.pdf
APPENDIX I_001.pdf
APPENDIX J_001.pdf
APPENDIX K_001.pdf
APPENDIX L_001.pdf
APPENDIX M_001.pdf
Figures
Figure 1 - Site Location.pdf
Figure 10 - 2007 Base Traffic Flows - AM Peak Hour.pdf
Figure 11 - 2007 Base Traffic Flows - PM Peak Hour.pdf
Figure 12 - KIG Site Layout Plan.pdf
Figure 13 - Proposed Access Junctions form A20.pdf
Figure 14 - Proposed Pedestrian and Cycle Access.pdf
Figure 15 - Potential Pedetrian and Cycle Improvements.pdf
Figure 16 - Potential Routes for Dedicated Bus Services.pdf
Figure 17 - Opportunities for Bus Improvements.pdf
Figure 18 - Traffic Impact Study Area.pdf
Figure 19 - Employment Trip Distribution.pdf
Figure 2 - Strategic Location.pdf
Figure 20 - AM Development Traffic.pdf
Figure 21 - PM Development Traffic.pdf
Figure 22 - 2016 Base Traffic Flows - AM Peak Hour.pdf
Figure 23 - 2016 Base Traffic Flows - PM Peak Hour.pdf
Figure 24 - 2016 Base Plus Development Traffic Flows - A (1).pdf
Figure 24 - 2016 Base Plus Development Traffic Flows - AM Pe.pdf
Figure 25 - 2016 Base Plus Development Traffic Flows - P (1).pdf
Figure 25 - 2016 Base Plus Development Traffic Flows - PM Pe.pdf
Figure 26 - 2026 Base Traffic Flows - AM Peak Hour.pdf
Figure 27 - 2026 Base Traffic Flows - PM Peak Hour.pdf
Figure 28 - 2026 Base Plus Development Traffic Flows - A (1).pdf
Figure 28 - 2026 Base Plus Development Traffic Flows - AM Pe.pdf
Figure 29 - 2026 Base Plus Development Traffic Flows - P (1).pdf
Figure 29 - 2026 Base Plus Development Traffic Flows - PM Pe.pdf
Figure 3 - Existing Footway Provision and 2km isochrone.pdf
Figure 4 - Exisitng Public Rights of Way Provision.pdf
Figure 5 - Existing Cycle Route Provision.pdf
Figure 6 - Existing Bus Routes and Stops.pdf
Figure 7 - Local Rail Routes and Stations.pdf
Figure 8 - Local Highway Network.pdf
Figure 9 - Strategic Transport Network.pdf
170907 DWP trans asst report.pdf
Application Letter, Forms.pdf
Application Site.pdf
Default.aspx
Environmental Statement Non-Technical Summary.pdf
Final KIG Consultation report.doc
masterplan.pdf
Rail connectivity report.doc
Rail report.pdf
Browser does not support script.
‹‹
Go back
Back to top
Browser does not support script.
Browser does not support script.